Clark County Correctional Facility
Vancouver, Washington, USA
The Clark County Commissioners engaged Nielsen-Wurster to analyze the claims filed by the Contractor with regard to the construction of the $13 million Clark County Correctional Facility located in Vancouver, Washington. The Contractor alleged the County caused construction delays and disruptions due to: excessive design changes; untimely response by design professionals with regard to material approval; shop drawing review and requests for clarification; defective plans and specifications; and numerous change orders. Nielsen-Wurster analyzed 150 issues to provide a responsibility assessment and to determine causation and entitlement, including a schedule delay analysis; productivity analysis; change order impact review; and shop drawing submittal review. As a result of Nielsen-Wurster's work, the claim was mediated and successfully settled at terms very favorable to the County.
|
|
| |
Jacksonville Detention
Center
Jacksonville, Florida, USA
Nielsen-Wurster provided a comprehensive
claims analysis of the Jacksonville
Detention Center in Florida including issue,
schedule, damage and entitlement analysis;
litigation support; and expert testimony.
The major Project issues centered on
unforeseen site conditions (buried tanks),
site downsizing, slab-on-grade and
structural pile revisions, late payments,
contractual errors, delayed design approval
and design revisions made during
construction. Nielsen-Wurster provided a
Project Report analyzing the Contractor's
planned versus as-built schedule and change
orders, and including a quantification of
damages. Nielsen-Wurster provided mediation
support as well as litigation support.
|
|