Vancouver Millennium Sky Train Project
British Columbia, Canada

Nielsen-Wurster was retained by SAR Transit Joint Venture (SAR), the joint venture Contractor for civil works, to conduct an independent schedule delay analysis and causation determination regarding the delayed completion of the Sky Train Project as originally established within the Agreement between SAR and the Owner (RTP Project 2000 LTD). Sky Train was a design-build project for approximately 16 kilometers of elevated guide way through a congested urban area, running alongside operating railway tracks and busy highways through environmentally sensitive areas. A late notice to proceed, right-of-way issues, and critical rail system and vehicle requirements forced the Contractor to reschedule the project three times. Re-sequencing of work caused delay to the critical path of the project. Nielsen-Wurster calculated and evaluated the delay through the project, the root cause for each impacting issue, event or situation; responsibilities for each issue; and the resultant impacts. The matter settled through mediation in favor of the Contractor (Client).

 
     

BACK TO TOP